Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Mitsubisi Padzhero
+ 1.1. Dashboard and control units
+ 2. Maintenance
- 3. Engines
   3.1. Candles
   3.2. Check of wires
   + 3.3. Ignition system
   - 3.4. Major maintenance of the engine
      3.4.1. Engine electric equipment
      3.4.2. Ignition distributor
      + 3.4.3. Generator
      3.4.4. Battery
      3.4.5. Starter
      3.4.6. Traction relay of a starter
      3.4.7. Sensors
      + 3.4.8. Instructions on service and engine repair
      3.4.9. Compression check in cylinders of engines
      3.4.10. Specifications of engines
      - 3.4.11. Removal and engine installation
         3.4.11.1. Engine of 2,6 l
         3.4.11.2. 12-klapanny engine of 3,0 l
         3.4.11.3. 24-klapanny engine of 3,0 l
         3.4.11.4. Engine of 3,5 l
      3.4.12. Cover of a head of the block of cylinders
      + 3.4.13. Rollers and yokes
      3.4.14. Thermostat of system of cooling
      3.4.15. Inlet collector
      3.4.16. Final collector
      3.4.17. The incorporated collector (a diesel engine with a turbo-supercharging)
      3.4.18. Turbokompressor
      3.4.19. Turbonagnetatel
      3.4.20. Radiator
      3.4.21. Maslookhladitel
      3.4.22. Fan
      3.4.23. The pump of cooling liquid
      + 3.4.24. Head of cylinders
      3.4.25. Valves and springs
      3.4.26. Saddles
      3.4.27. Replacement of directing plugs
      3.4.28. Hydropushers
      + 3.4.29. Gear belt and covers
      3.4.30. Chain and cover (engine of 2,6 l)
      3.4.31. Oil pallet
      3.4.32. Oil pump and saylent-rollers (vibrogasitel)
      3.4.33. Cam-shafts and support
      3.4.34. Check of a condition of a cam-shaft
      + 3.4.35. Pistons and rods
      3.4.36. Back epiploon
      3.4.37. Radical bearings
      3.4.38. Flywheel
      + 3.4.39. Exhaust system
   + 3.5. Diesel and turbodiesel engines 2,5 and 2,8 of l
+ 4. Cooling system
+ 5. Greasing system
+ 6. Power supply system
+ 7. Release system
+ 8. Fuel system
+ 9. Running gear
+ 10. Suspension bracket and steering
+ 11. Brake system
+ 12. Body
+ 13. Electric equipment
+ 14. Electroschemes






3.4.11.4. Engine of 3,5 l

GENERAL INFORMATION

ORDER OF REMOVAL OF THE ENGINE OF 3,5 L

Disconnected units, hoses and wires at dismantle of the engine of 3,5 l

11. Burn down control systems of the engine
12. Starter and generator plait
13. Joint of a maslookhladitel
14. Accelerator cable
15. Butterfly valve cable
16. Hose of the amplifier of brakes
17. Gasoline pipe line joint
18. Heater hose
19. Socket of the sensor of pressure of oil
20. Bolt of a support of the engine
21. Engine

Removal

PERFORMANCE ORDER
1. Remove a cowl.
2. Remove the battery and a tray.

3. Remove intermediate draft cruise control. For this purpose execute the following:

  – unscrew a bolt and remove a protective casing of draft;
  – disconnect from draft a butterfly valve cable, a cable of an accelerator and cruise control. Adjusting bolts and nuts do not turn on;
  – unscrew 4 bolts and remove intermediate draft;
  – remove the draft arm, all bolts and screws store in separate packages to screw on former places.

4. Lift the car and remove engine and transmission guards.
5. Disconnect weight.
6. Merge liquid from cooling system. Merge oil from transmission and the engine.
7. Disconnect on the engine hoses of a radiator and other hoses of system of cooling.
8. Remove a fan casing.
9. Remove a radiator.
10. Disconnect from collectors exhaust pipes.
11. Remove transmission (see subsection 9.3.6).
12. Remove the pump of the hydraulic booster and take aside, without disconnecting from the highway.
13. Remove a belt of a drive of the generator.
14. Remove the conditioner, without disconnecting from the highway, take aside and fix.
15. Remove a pulley of the pump of system of cooling with the fan.
16. Disconnect from the engine all wires (a starter, the generator, a control system and sensors).
17. Unscrew the union of a maslookhladitel.
18. Disconnect a hose of the amplifier of brakes.
19. Disconnect fuel hoses from the leveling chamber and heater hoses in a back part of an inlet collector.
20. Attach таль the lift and will hang out the engine.
21. Remove guards of support of the engine and unscrew bolts of fastening of support of the engine to a frame.
22. Carefully lift the engine and get from a motor compartment. Establish the engine on supports or wooden whetstones (not on the pallet).

Installation

PERFORMANCE ORDER
the stanovka of the engine is carried out upside-down. Tighten bolts of support with the moment of 44 N of m. Replace laying of exhaust pipes on collectors. Bolts of fastening of a pulley of the fan tighten with the moment of 10-12 N of m. Bolts of fastening of a radiator tighten with the moment of 8-11 N of m. Fill in fresh liquid and oil, start the engine. After warming up restore levels of liquids. Repeatedly adjust a zaslonka cable, belts, idling.