Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Mitsubisi Padzhero
+ 1.1. Dashboard and control units
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling system
+ 5. Greasing system
+ 6. Power supply system
+ 7. Release system
+ 8. Fuel system
- 9. Running gear
   + 9.1. Mechanical transmission
   + 9.2. Coupling
   - 9.3. Automatic transmission
      9.3.1. Adjustments
      + 9.3.2. The blocking switch
      9.3.3. Check of adjustment of a cable of management by transmission
      9.3.4. Mechanism of management of transmission
      9.3.5. Epiploon of a shaft of a case of transmission
      9.3.6. Removal and transmission installation
      9.3.7. Transfer case
      9.3.8. Forward and back epiploons
      - 9.3.9. Forward driveshaft and crosspieces
         9.3.9.1. Replacement of the kardanny hinge
      + 9.3.10. Back driveshaft and crosspieces
      9.3.11. Forward leading axis
      9.3.12. A nave with a manual unblocking
      9.3.13. A nave with an automatic unblocking
      9.3.14. Forward semi-axes and epiploons of a forward axis
      9.3.15. Reducer of a forward axis
      9.3.16. Dismantling of CV JOINTS
   + 9.4. Zadny Bridge
+ 10. Suspension bracket and steering
+ 11. Brake system
+ 12. Body
+ 13. Electric equipment
+ 14. Electroschemes






9.3.9. Forward driveshaft and crosspieces

GENERAL INFORMATION

Forward and back driveshafts

1. Back shaft
2. Forward shaft
3. To oil GL-4 or SAE 80W

Removal and installation

PERFORMANCE ORDER
1. Lift the car and establish on supports.
2. Merge from a transfer case oil.
3. Put labels of mutual orientation of a flange of the driveshaft from the party of a forward reducer and on a flange of a leading gear wheel of the main transfer of a forward reducer.
4. Unscrew fastening bolts, disconnect a shaft and get from a transfer case.
5. Installation is carried out upside-down.
6. Combine labels on shaft and reducer flanges.
7. Tighten bolts of fastening of a flange with the moment of 49-58 N of m, jams tighten with the moment of 29-34 N of m.