Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Mitsubisi Padzhero
+ 1.1. Dashboard and control units
+ 2. Maintenance
- 3. Engines
   3.1. Candles
   3.2. Check of wires
   + 3.3. Ignition system
   + 3.4. Major maintenance of the engine
   - 3.5. Diesel and turbodiesel engines 2,5 and 2,8 of l
      3.5.1. Removal and engine installation
      3.5.2. Engine dismantling
      3.5.3. Pistons and rods
      3.5.4. Valves and shaft of yokes
      3.5.5. Head of cylinders and valves, shaft of yokes and yoke
      3.5.6. Head of cylinders
      3.5.7. Compression check
      3.5.8. Camshaft and gas-distributing mechanism
      3.5.9. Drive of the mechanism of a gazoraspredeleniye
      3.5.10. Adjustment of gaps of valves
      3.5.11. Adjustment of a tension of a gear belt
      3.5.12. Removal of the bottom protective casing of a gear belt
+ 4. Cooling system
+ 5. Greasing system
+ 6. Power supply system
+ 7. Release system
+ 8. Fuel system
+ 9. Running gear
+ 10. Suspension bracket and steering
+ 11. Brake system
+ 12. Body
+ 13. Electric equipment
+ 14. Electroschemes






3.5.5. Head of cylinders and valves, shaft of yokes and yoke

GENERAL INFORMATION

Correct assembly of a shaft of yokes

1. Yokes of inlet valves

2. Yokes of final valves

Each of springs (3) settles down between yokes.

Assembly drawing of a head of cylinders of the diesel engine

1. Ventilation hose
2. Stopper maslozalivny горловигы
3. Cover of a head of cylinders
4. Laying of a cover of a head of cylinders
5. Semicircular consolidation
6. Shaft of yokes
7. Yoke of the inlet valve
8. Yoke of the final valve
9. Spring of a shaft of yokes
10. Adjusting screw
11. Camshaft epiploon
12. Cover of the forward bearing
13. N2 bearing cover
14. N3 bearing cover
15. N4 bearing cover
16. Cover of the back bearing
17. Camshaft

Yokes of inlet and final valves differ and have marking or "I" (inlet valves), or "Е" (final valves). Openings for oil injection on a shaft of yokes should settle down after installation from below. The shaft end with one lubricant opening should settle down from the forward party. On other end of a shaft there are two lubricant openings.

Covers of N2 bearings, 3 and 4 have marking with their numbers. Covers of N1 bearings and 5 are not marked, as they can be distinguished in their form.

The shaft of yokes is established after camshaft installation.
PERFORMANCE ORDER
1. Grease all details of the mechanism of yokes with engine oil and establish yokes and springs on a shaft.
2. Insert both bolts and spring washers and tighten bolts the inhaling moment from 35 to 40 N of m.
3. Other works are carried out to similarly petrol engines. Establish a gear belt and other details of a drive of the gas-distributing mechanism. On fig. The assembly drawing of a head of cylinders of the diesel engine details of a shaft of yokes are presented. After installation adjust gaps of valves on the cold engine and finish them to preset values after an engine warming up.