| 1. Be convinced that the socket of the control unit is reliably fixed. |
| 2. Connect a conclusion "10" control units to "weight". |
| 3. Check tension on control unit conclusions. |
| 4. Separate the socket of the control unit and check integrity of a chain, connecting an ohmmeter to conclusions of a block of a plait of wires. |