Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Mitsubisi Padzhero
+ 1.1. Dashboard and control units
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling system
+ 5. Greasing system
+ 6. Power supply system
+ 7. Release system
+ 8. Fuel system
- 9. Running gear
   - 9.1. Mechanical transmission
      9.1.1. Mechanism of management of a check point
      9.1.2. Sensor of switching off of coupling (1990-98)
      9.1.3. Gear shifting lever (and/m 4х4)
      9.1.4. Switch of a signal of movement by a backing
      9.1.5. Epiploon of a shaft of a check point (or leading shaft of a transfer case)
      9.1.6. Removal and check point installation
   + 9.2. Coupling
   + 9.3. Automatic transmission
   + 9.4. Zadny Bridge
+ 10. Suspension bracket and steering
+ 11. Brake system
+ 12. Body
+ 13. Electric equipment
+ 14. Electroschemes






9.1.6. Removal and check point installation

GENERAL INFORMATION

Transmission and transfer case and/m 1992-98.

N–the detail is subject to the obligatory
to replacement at dismantling assembly
1. Casing (cover)
2–6. Sockets
7. Sensor of switching off of a lobby
leading axis
8. Speedometer cable
9, 12, 13. Guard
10. Main cylinder
11. Starter
14, 15. Lateral arm
16. Cover of a case of coupling
17. Torsion of a check point support
18. Arm
19. 2nd cross-piece
20. Pillow of a back support of the engine
21. Arm of a guard of a transfer case
22. Damper
23. A check point with a transfer case
24. Case of a control lever of a check point
25. Laying
and. The sizes and carvings of the bolts specified by letters And, In etc.

Removal and installation

CARS OF 1983-89.

PERFORMANCE ORDER
1. Transfer the check point lever to neutral situation.
2. Remove the check point lever and close an opening.
3. Disconnect the battery from weight and lift the car.
4. Designate the provision of flanges of driveshafts and disconnect shaft from a check point.
5. Designate and disconnect from a check point case all cables and wires, disconnect wires from a starter.
6. Slightly will hang out the engine, having propped up it a jack in the pallet through a wooden block.
7. Remove a transfer case.
8. Remove a starter.
9. Prop up a check point the cart with a jack.
10. Unscrew at first bolts of a case of coupling, then bolts and nuts of fastening of a cross-piece, remove a cross-piece and details of fastening of a cross-piece.
11. Lower a jack of the engine a little and disconnect a check point from the engine, having displaced the cart so that primary shaft of a check point left coupling.
12. Installation is carried out upside-down.
13. Tighten connections with the next moments: bolts of a case of coupling – 49 N of m, starter nuts – 27 N of m, bolts of a transfer case – 12 N of m.

CARS OF 1990-98.

PERFORMANCE ORDER
1. Transfer the check point lever to neutral situation.
2. Remove the check point lever and close an opening.
3. Disconnect the battery from weight and lift the car.
4. Remove a guard of a transfer case.
5. Remove a forward exhaust pipe.
6. Merge from a check point oil.
7. Designate the provision of flanges of driveshafts and disconnect shaft from a check point.
8. Remove a cover from a check point shaft.
9. Designate and disconnect from a check point case all cables and wires.
10. Remove a guard of the main cylinder of coupling, remove the cylinder, take aside and fix.
11. Remove a starter.
12. Slightly will hang out the engine, having propped up it a jack in the pallet through a wooden block.
13. Prop up a check point the cart with a jack.
14. Disconnect lateral arms from a check point case.
15. Remove the bottom cover of a case of coupling.
16. Remove an arm of a transfer case.
17. Unscrew at first bolts of fastening of a check point to a cross-piece, raise a check point on 6 mm and remove a cross-piece.
18. Remove a check point with a transfer case.
19. For this purpose unscrew bolts and submit a check point towards a back part of the car a little, having displaced the cart.
20. Lower and remove a check point, having slightly inclined a forward part and having submitted so that not to touch a back extreme cross-piece forward.
21. Installation is carried out upside-down.
22. At check point installation on the engine совестите openings with directing pins, having slightly inclined the engine.
23. Tighten connections according to the demanded moments.