Mitsubishi Pajero

1982-1998 of release

Repair and car operation



Mitsubisi Padzhero
+ 1.1. Dashboard and control units
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling system
+ 5. Greasing system
+ 6. Power supply system
+ 7. Release system
- 8. Fuel system
   + 8.1. Carburetor engines
   - 8.2. Engines with fuel injection
      8.2.1. Decompression of fuel system
      8.2.2. Fuel pump
      8.2.3. Throttle branch pipe
      8.2.4. Adjustment of a cable of an accelerator
      8.2.5. Nozzles
      8.2.6. Pressure regulator
      8.2.7. Reduktsionny valve of a tank
      8.2.8. Fuel filter
   + 8.3. Diesel engines
+ 9. Running gear
+ 10. Suspension bracket and steering
+ 11. Brake system
+ 12. Body
+ 13. Electric equipment
+ 14. Electroschemes






8.2.5. Nozzles

GENERAL INFORMATION

Laying orientation on a throttle branch pipe (2,4 l)

1. Branch pipe

2. To a collector

3. Laying

4. Ledge


ENGINE OF 2,4 L

Removal

PERFORMANCE ORDER
1. Execute a decompression and disconnect the battery from weight.
2. Merge liquid.
3. Remove a throttle branch pipe (see subsection 8.2.3).
4. Disconnect from nozzles sockets.
5. Disconnect from the fuel distributor gasoline pipe lines.
6. Remove a pressure regulator.
7. Remove the fuel distributor, get nozzles, insulators, a sealant and rings. Do not allow hit on dust and dirt nozzles.

Installation   
PERFORMANCE ORDER
1. Replace all laying and a sealant of nozzles and other removed units.
2. Nozzles establish turn to the right-to the left.
3. Tighten bolts and nuts with the moments specified an illustrations.

ENGINES 3,0 AND 3,5 L

Removal

PERFORMANCE ORDER
1. Execute a decompression and disconnect the battery from weight.
2. Merge liquid.
3. Remove an inlet collector.
4. Disconnect from the fuel distributor gasoline pipe lines.
5. Remove a pressure regulator.
6. Disconnect from nozzles sockets.
7. Unscrew bolts of fastening of an inlet pipe (the fuel distributor uniform on 2 heads).
8. Remove the fuel distributor with форсунами.
9. Get nozzles. On the engine of 3,5 l of a nozzle fasten brackets (1 – a bracket; 2–nozzle).

Installation

PERFORMANCE ORDER
1. Replace all insulators and a sealant of nozzles, laying from other removed units, being guided by an illustration.
2. Tighten bolts and nuts.

Check of nozzles

Nozzles are checked by listening of clicks through a stethoscope or a long screw-driver, measurement of electric resistance of a winding which should be 13–16 Ohm at 20 ° With, and also on a torch at the stand (it is carried out in car-care center).


Prevention

It is forbidden to check nozzles 12 V-tension from the battery, otherwise they will fail.