Mitsubisi Padzhero + 1.1. Dashboard and control units + 2. Maintenance + 3. Engines + 4. Cooling system + 5. Greasing system + 6. Power supply system + 7. Release system - 8. Fuel system + 8.1. Carburetor engines - 8.2. Engines with fuel injection 8.2.1. Decompression of fuel system 8.2.2. Fuel pump 8.2.3. Throttle branch pipe 8.2.4. Adjustment of a cable of an accelerator 8.2.5. Nozzles 8.2.6. Pressure regulator 8.2.7. Reduktsionny valve of a tank 8.2.8. Fuel filter + 8.3. Diesel engines + 9. Running gear + 10. Suspension bracket and steering + 11. Brake system + 12. Body + 13. Electric equipment + 14. Electroschemes
|
Laying orientation on a throttle branch pipe (2,4 l)
|
1. Branch pipe
2. To a collector
3. Laying
4. Ledge
|
ENGINE OF 2,4 L
Removal
PERFORMANCE ORDER |
1. Execute a decompression and disconnect the battery from weight. |
2. Merge liquid. |
3. Remove a throttle branch pipe (see subsection 8.2.3). |
4. Disconnect from nozzles sockets. |
5. Disconnect from the fuel distributor gasoline pipe lines. |
6. Remove a pressure regulator.
|
7. Remove the fuel distributor, get nozzles, insulators, a sealant and rings. Do not allow hit on dust and dirt nozzles.
|
|
Installation
PERFORMANCE ORDER |
1. Replace all laying and a sealant of nozzles and other removed units. |
2. Nozzles establish turn to the right-to the left. |
3. Tighten bolts and nuts with the moments specified an illustrations. |
|
ENGINES 3,0 AND 3,5 L
Removal
PERFORMANCE ORDER |
1. Execute a decompression and disconnect the battery from weight. |
2. Merge liquid. |
3. Remove an inlet collector. |
4. Disconnect from the fuel distributor gasoline pipe lines. |
5. Remove a pressure regulator.
|
6. Disconnect from nozzles sockets.
|
|
7. Unscrew bolts of fastening of an inlet pipe (the fuel distributor uniform on 2 heads). |
8. Remove the fuel distributor with форсунами. |
|
9. Get nozzles. On the engine of 3,5 l of a nozzle fasten brackets (1 – a bracket; 2–nozzle). |
|
Installation
PERFORMANCE ORDER |
|
1. Replace all insulators and a sealant of nozzles, laying from other removed units, being guided by an illustration. |
|
2. Tighten bolts and nuts. |
|
Check of nozzles
Nozzles are checked by listening of clicks through a stethoscope or a long screw-driver, measurement of electric resistance of a winding which should be 13–16 Ohm at 20 ° With, and also on a torch at the stand (it is carried out in car-care center).
Prevention
It is forbidden to check nozzles 12 V-tension from the battery, otherwise they will fail.
|
|