Mitsubisi Padzhero + 1.1. Dashboard and control units + 2. Maintenance + 3. Engines + 4. Cooling system + 5. Greasing system + 6. Power supply system + 7. Release system + 8. Fuel system + 9. Running gear + 10. Suspension bracket and steering + 11. Brake system + 12. Body - 13. Electric equipment 13.1. Detection of malfunctions in electric equipment system 13.2. Tension check 13.3. Detection of short circuit 13.4. Check of reliability of grounding 13.5. Check of integrity of a chain 13.6. Finding of not closed chain 13.7. Safety locks 13.8. Burned-through crossing points 13.9. Automatic switches 13.10. System of safety of SRS (safety cushion) + 13.11. Heater + 13.12. Conditioner + 13.13. Cruise control + 13.14. Audiosystem + 13.15. Cleaners of glasses - 13.16. Devices and switches 13.16.1. Guard devices / combination of devices 13.16.2. Speedometer cable 13.16.3. Indexes of pressure of oil, fuel and temperature level, voltmeter 13.16.4. Printed-circuit board 13.16.5. Multimeter 13.16.6. Switches of screen wipers 13.16.7. Block of switches (headlights, turn, glass cleaner) + 13.17. Lighting devices + 13.18. Protection devices of electric chains + 14. Electroschemes
|
The cable of a speedometer connects a reducer on transmission to the index of speed.
Replacement of a cable is necessary in case of its wear when characteristic noise published by a cable can be taken for malfunction of the engine. It is possible to determine malfunction of a cable by sharp jumps of an arrow of the index of speed.
On a part of cars the cable is connected to the generator of impulses, instead of with the index of speed. These impulses are used for management of a power supply system and ignition, and also will be transformed to indications of speed and the passable way. Replacement
PERFORMANCE ORDER |
1. For replacement of a cable it is necessary to disconnect it from a check point. having unscrewed a cap nut, to remove a guard of devices and to disconnect from a guard a cover (see subsection 13.16). |
2. The cable gets from a cover. |
3. At cable replacement slightly grease its litoly (greasings 25 mm from the end should not be closer). |
|
|
|