Mitsubisi Padzhero + 1.1. Dashboard and control units + 2. Maintenance + 3. Engines + 4. Cooling system + 5. Greasing system + 6. Power supply system + 7. Release system - 8. Fuel system - 8.1. Carburetor engines 8.1.1. Mechanical fuel pump - 8.1.2. Carburetor 8.1.2.1. Removal and carburetor installation 8.1.2.2. Dismantling and carburetor assembly + 8.2. Engines with fuel injection + 8.3. Diesel engines + 9. Running gear + 10. Suspension bracket and steering + 11. Brake system + 12. Body + 13. Electric equipment + 14. Electroschemes
|
The Feedback-carburetor and disconnected details at its dismantle (the engine of 2,6 l)
1. Air filter 2. Vacuum hoses 3. Control system hose паров gasoline 4. A hose of cooling liquid 5. Fuel hose 6. Butterfly valve cable 7. A clamp (on and/m with automatic transmission)
|
8. Pin 9. A butterfly valve cable (on and/m with automatic transmission) 10. Burn down conductings 11. Carburetor 12. Laying |
Adjustment
CABLE OF THE DRIVE OF THE BUTTERFLY VALVE
PERFORMANCE ORDER |
1. Warm up the engine. |
2. Check люфт pedals which should be 0–20 mm. |
3. If necessary adjust, having moved a cable at the released lock-nuts of a cover of a cable on the carburetor. |
|
Check
FUEL LEVEL
PERFORMANCE ORDER |
1. Uncover the carburetor and laying. |
2. Overturn a cover and check distance between the top part of a float and the plane of a cover which should be 19–21 mm. |
3. If necessary adjust, laying washers under a saddle of the needle valve. |
4. For this purpose remove a float, get the valve and turn out a saddle. |
|
ELECTROPNEUMOVALVE (1987-90)
PERFORMANCE ORDER |
1. Designate and disconnect hoses and the socket from the control electropneumovalve on a partition of a motor compartment. |
2. Attach the manual vacuum pump to the hose union with a white strip, connect valve conclusions to the battery and weight. |
3. Create in the valve depression and according to the chart check operation of the valve. |
4. Check resistance of the solenoid. which should be 40–46 Ohm at 20 ° Page. |
5. If operation of the valve differs from specified in the chart, and resistance does not correspond to norm, the valve replace. |
|
|
|